WP 2 : Measurement campaign

Starting the preparatory phase for the experimental campaign

The members of WP 2 (UMRAE, Cerema, EDF DTG, EDF Renouvelables, ENSTA) met on 28/03 at the site planned for the long-term experimental campaign. This campaign will last 1 year and will study the variability of sound levels according to environmental conditions (meteorology, ground conditions, etc.) and different locations. This in-situ meeting initiates the start of the preparatory phase for the experimental campaign; it enables to identify possible measurement locations, site characteristics, and issues to be solved before the campaign according to the constraints of the site.